Measuring twice

Skip to content

Building works

Self-Levelling & Floating Floor Works

A good floor starts flat. We prepare the base, then pour self-levelling compound or lay a screed so the surface is smooth and level, ready for the finish. On top we install floating floors — click-fit vinyl and laminate planks laid over an underlay without glue — which go down quickly, feel comfortable underfoot and suit HDB flats, condos, shops and offices alike. Skirting and trims finish the edges neatly.

Category
Building works
Sheet
09 / 13
Photos
5 on file
Availability
Mon–Sun, 8am–11pm

Scope of works

What's covered.

Every job starts with a site assessment, so the final scope is agreed with you before any work begins.

  • Floor preparation & priming
  • Self-levelling compound
  • Screeding
  • Floating vinyl & laminate floors
  • Underlay & moisture barrier
  • Skirting & trims

On video

See the work in motion.

2 short clips from the job. Tap any clip for sound and full screen.

Clip 01 · 0:11
Preparing the floor base before levelling
Clip 02 · 0:12
Mixing the levelling screed

Photos

From the job.

5 photos of self-levelling & floating floor works work. Tap any photo to view it full screen.

How a job runs

From first message to handover.

  1. 01

    Message us on WhatsApp

    Start on WhatsApp
  2. 02

    Site assessment

  3. 03

    Quotation

  4. 04

    Works to handover

Start with a message

Tell us about your self-levelling & floating floor works job.

WhatsApp is the quickest way to reach us. Tell us what needs doing, add a few photos, and we'll take it from there.

Open Mon–Sun, 8am–11pm · 24-hour emergency service